...
- Change the contract on the jobs to Cost Plus. Enter the password, if prompted.
- Go to each cost code on the job and decide if the profit type on the cost codes should be changed from a 2 (NONENone) to a different calculation.
- After changing the profit types on the cost code, a journal entry with the prefix PRFTCHG is created.
- After the PRFTCHG is posted, the job is recalculated with the expected contract amount.
...
- Change the contract type.
- Enter the password.
Changing from a Cost Plus/NTE to Fixed Contract Type with Posted Costs
...
with Posted Costs
- Change the profit types on the cost codes ( to 2 =(None).
- Change the contract type on the job and enter the password.
...