Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Table of Contents

Print by Job Number

Image RemovedImage Added

Print by Division

Image RemovedImage Added

End-of-

...

Report Footer

Image RemovedImage Added

Schedule

The Schedule displays to the right with a row that includes the scheduled hours for each cost code for the job. The screenshot below does not show the entire 6-weeks. The starting date correlates with the Schedule Start Date entered in the report parameters.

Image RemovedImage Added